Companies are increasingly affected by rising energy costs and pressure from investors and customers to decarbonize operations. Owning a renewable energy source and consuming green electricity directly at the point of generation is a solution, but its preparation and implementation can be complex – from technical studies and supplier selection to permits and watertight contracts.
The installed capacity of photovoltaic power plants approximately doubled between 2021 and the end of 2024. Today, solar investments typically pay off within 6–8 years.
Interested in your own solar or wind energy source? Book a non-binding consultation.
We analyzed zoning restrictions, prepared contractual documentation, and provided support to developer NOHO in building a carbon-neutral district in Hradec Králové.
For MTX Group, we assessed the compliance of projects with zoning plans and studies of limits for the construction of solar and wind power plants. We prepared a PPA contract between subsidiaries.
We prepared a legislative analysis, operating models, and a financing proposal for a new energy community for the Prague 12 district.
We provided YIT STAVO with a legal analysis of wind farm locations, taking into account territorial limits and the protection of military facilities.
For the Moravian-Silesian Region, we designed models for installing photovoltaic power plants on the roofs of regional buildings and prepared tender documentation for selecting suppliers.
We have prepared proposals for cooperation with developers and recommendations on how to address the energy needs of the city and its residents for the city of Aš.
Download Frank Bold's analysis showing how European companies in five key sectors are coping with the new sustainability rules under the CSRD and ESG standards. We assess dual materiality, transition plans and sustainability responsibilities. The paper informs the development of sector standards and implementation guidelines.
We are part of the Frank Bold Expert Group
Copyright ©
Aktuální rok script
Frank Bold